Volume 14 Issue 3
Apr.  2011
Turn off MathJax
Article Contents
YANG Xiaoyong, WU Faquan, SU Shengrui. 2006: DYNAMIC CONSTRUCTIONAL RESPONSE OF A SHALLOW-BURIED AND UNSYMMETRICAL-LOADED DOUBLE-ARCH TUNNEL ACROSS AN ANCIENT LANDSLIDE. JOURNAL OF ENGINEERING GEOLOGY, 14(3): 314-319.
Citation: YANG Xiaoyong, WU Faquan, SU Shengrui. 2006: DYNAMIC CONSTRUCTIONAL RESPONSE OF A SHALLOW-BURIED AND UNSYMMETRICAL-LOADED DOUBLE-ARCH TUNNEL ACROSS AN ANCIENT LANDSLIDE. JOURNAL OF ENGINEERING GEOLOGY, 14(3): 314-319.

DYNAMIC CONSTRUCTIONAL RESPONSE OF A SHALLOW-BURIED AND UNSYMMETRICAL-LOADED DOUBLE-ARCH TUNNEL ACROSS AN ANCIENT LANDSLIDE

Funds:

  • Received Date: 2005-06-24
  • Rev Recd Date: 2005-08-31
  • Publish Date: 2006-05-22
  • Surrounding rock-mass stability of underground engineering under complex geological conditions has been one of the hot topics for engineering geologists.This paper presents a case study of a double-arch tunnel Manxie No.4,one of Simao-Xiaomengyang expressway tunnels,encountered an extremely complicated geological structure.The authors simulated the dynamic constructional response of a shallow-buried and unsymmetrical-loaded double-arch tunnel across ancient landslide,including press field,displacement field and plastic zones in surrounding rock-mass.In addition,locations of stress concentration and potential failure zones are clearly delineated in rock-mass,which will not only provide information needed for guiding the construction of the tunnel,but also establish valid theoretical evidence for optimal design of the tunnel.At the end,the authors emphasize that complete treatment of whole ancient landslide and sufficient reinforcement of partition wall should be taken to ensure stability of surrounding rock-mass and safety of the whole double-arch tunnel.
  • loading
  • [1] 孙井林.利用AN SY S软件模拟施工隧道开挖
    [J].甘肃科技,2003,19(6):25~26.Sun Jing lin.N um erical s miu lat ion of tunnel constru ct ion throughA nsys,G an su Science and T echnology,2003,19(6):25~26.

    [2] 中华人民共和国交通部.公路工程地质勘察规范(TJT 064-98)
    [S].北京:人民交通出版社,1994.The M in istry of C omm un icat ion of Peop le,s R epub lic of C h ina.The H ighway Engin eering G eological Su rvey Code(TJT 064-98).Beijing:Ch ina Comm unicat ions press,1994.

    [3] 靳晓光,刘伟,等.小净距公路隧道施工过程的数值模拟
    [A].全国高速公路学术会论文集
    [C].北京:交通出版社,2003.J in X iaoguang,L iu W e,i et al..N um erical s mi ulation of sm all n etspan h ighw ay tunnel,s con struction.A cadem ic Sympos ium on N at ioanal Exp ressw ay,2003.

    [4] 张倬元,王士天,等.工程地质分析原理
    [M].北京:地质出版社,1997.Zhang Zhuoyuan,W ang Sh it ian,et al..A n alytical p rincip le ofeng ineering geology.Be ijing:G eology Press,1997.

    [5] 王文正,胡庆安,等.公路双联拱隧道施工过程的弹塑性分析
    [A].全国高速公路学术会论文集
    [C].北京:交通出版社,2003.W angW en zheng,H u Q ing,an,et al..E last ic-p last ic analys isof doub le-arch tunnel,s con struction.A cadem ic Sym pos ium onN at ioan al Expressway,2003.

    [6] 肖明.地下洞室施工开挖三维动态过程数值模拟分析
    [J].岩土工程学报,2000,22(4):421~425.X iao M ing.Th ree-d mi en sion numerical m od el of constructionprocess for underground open ing.Ch inese Journ al of G eotechn icalE ngineering,2000,22(4):421~425.

    [7] 陶志平,周德培.滑坡地段隧道变形机理的模型试验研究
    [J].工程地质学报,2003,11(3):323~327.Tao Zh ip ing,Zhou D epe.i M odel test on deform ation m echan ismof tunn el at landslide s ite.Jou rnal of E ngineering G eology,2003,11(3):323~327.

    [8] 张德华,王梦恕.世界第一高隧青藏铁路风火山隧道施工新技术
    [J].工程地质学报,2003,11(2):213~216.Zhang D ehua,et al..N ew Techn iqu e for con struction of Fenghuoshan Tunnel, th e h ighest tunnel in the w orld,of Q inghai-T ib etR ailw ay.Jou rnal of Engineering G eology,2003,11(2):213~216.

    [9] 张丹,施斌,徐洪钟.基于BO TDR的隧道应变监测研究
    [J].工程地质学报,2004,12(4):422~426.Zhang D an,et a.l.The BOTD R-based strain mon itoring for tun
    nel. Journal of Eng ineering G eology,2004,12(4):422~426.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (3179) PDF downloads(885) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint