Citation: | LU Shuqiang, XU Mo, JU Nengpan. 2006: NUMERICAL ANALYSIS WITH FLAC~(3D) ON ROCK MASS STABILITY SURROUNDING CAVERN GROUP IN THE LEFT BANK SLOPE OF A HYDROPOWER STATION ON LAN-CANG-JIANG RIVER. JOURNAL OF ENGINEERING GEOLOGY, 14(3): 351-355. |
[1] Itasca Consulting Group,Inc.FLAC3D(Fast Lagrangian Analysisof Continua in 3 D imension)U ser’sManuals,Version 2.1,M in2neapolis,M innesota,2002.
[2] 黄润秋,许强.显式拉格朗日差分分析在岩石边坡工程中的应用 [J].岩石力学与工程学报,1995,14(4):346~354. Runqiu,Xu Q ing.App lication of exp licit Lagrangian Finite-difference method in rock slope engineering.Chinese Journal ofRock Mechanics and Engineering,1995,14(4):346~354. [3] 梁海波,李仲奎,谷兆棋.FLAC程序及其在我国水电工程中的应用 [J].岩石力学与工程学报,1996,15(4):193~200.L iang Haibo,L iZhongkui,Gu Zhaoqi.FLAC and its app licationfor hydropower p rojects in china.Chinese Journal of Rock Mechanics and Engineering,1996,15(4):193~200. [4] 凌标灿,彭苏萍.工程因素对围岩稳定性影响三维数值模拟分析 [J].工程地质学报,2003,11(2):367~371.L ing B iaocan,Peng Sup ing.3D numerical simulation and analysisof the effect of engineering factors on the stability of surroundingrock.Journal of Engineering Geology,2003,11(2):367~371. [5] 杨为民,陈卫忠,李术才等.快速拉格朗日分析巨型地下洞室群稳定性 [J].岩土工程学报,2005,27(2):230~234.Yang D iansen,Chen W eizhong.Stability analysis of surroundingrock mass of Longtan underground caverns.Rock and Soil Mechanics,2005,27(2):230~234. [6] 陈帅宇,周维恒,杨强,等.三维快速拉格朗日法进行水布垭地下厂房的稳定性分析 [J].岩石力学与工程学报,2003,22(7):1047~1053.Chen Shuaiyu,Zhou weiyuan.Analysis on stability of surroundingrocks of Shuibuya underground p lant by Three-dimensional FastLagrangian Method.Journal of Rock Mechanics and Engineering,2003,22(7):1047~1053. [7] 巨能攀,黄润秋,许模,卢书强.某水电站地下洞室随机块体稳定性评价及系统锚固设计 [J].工程地质学报,2004,12(2):208~214.Ju Nengpan,et al..Stability evaluation of random blocks and design of systematic anchoring for the underground caverns in a hydropower station.Journal of Engineering Geology,2004,12(2):208~214. [8] 乔国文,王运生,房冬恒.西南某电站右岸开挖边坡稳定性的FLAC3D分析 [J].工程地质学报,2004,12(3):280~284.Q iao Guowen,W ang Yunsheng,Fang Dongheng.A FLAC3danalysis of the slope stability at a hydropower station.Journal of Engineering Geology,2004,12(3):280~284. [9] 崔银祥,聂德新,陈强.某电站大型地下洞室群主变洞确定性块体稳定性评价 [J].工程地质学报,2005,13(2):212~217.Cui Yinxiang,N ie Dexin,Chen Q iang.Stability assessment of determ inistic blocks of a main-transformed cavern in a huge underground powerhouse.Journal of Engineering Geology,2005,13(2):212~217. |