LI Cangsong, GAO Bo, WANG Shichun. 2006: PRELIMINARY CLASSIFICATION METHOD FOR ROCK MASS SURROUNDING KARSTS. JOURNAL OF ENGINEERING GEOLOGY, 14(6): 808-814.
Citation: LI Cangsong, GAO Bo, WANG Shichun. 2006: PRELIMINARY CLASSIFICATION METHOD FOR ROCK MASS SURROUNDING KARSTS. JOURNAL OF ENGINEERING GEOLOGY, 14(6): 808-814.

PRELIMINARY CLASSIFICATION METHOD FOR ROCK MASS SURROUNDING KARSTS

  • Received Date: 2006-05-31
  • Rev Recd Date: 2006-06-19
  • Publish Date: 2006-11-22
  • Many types of Karsts can be encountered when a tunnel in Karst ground was constructed.Generally the primary design classification of the surrounding rock mass should be revised according to the excavation condition.A classification methd for rock mass surrounding Karsts is put out in this paper.Several general conceptions about the rock classification are described.The classification standards are based on the correction coefficient of Karst development degree.The Wulong tunnel at Hengdong section is used as an example.The application shows that the classification with this method agrees well with the findings during the tunnel construction.In the method,the synthesis factors such as possibility of Karst development and Karst forms are considered.The method is the correction of the origin classification methodsthe rock surrounding Karsts.The method still needs to be verified in the future practice.examined.
  • loading
  • [1]  李苍松.长大岩溶隧道施工地质预报方法综述
    [A].2003年中国土建工程学术暨建设成果论文集(下册)
    [C].成都:四川科学技术出版社,2003,612~617.L i Cangsong.Overview of karst geology p rediction methods for long-great constructing tunnel,Symposium of China civil engineeringacadem ic and construction achievement(second of two).Chengdu:Shichuan Sscience and Technology Press,2003,612~617.

    [2]  李苍松,陈成宗.长大隧道岩溶围岩特性初步研究
    [J].现代隧道技术,2002,(增刊):338~342.L i Cangsong,Chen Chengzong.Prelim inary research on karst rockcharacter in long-great tunnels.Modern Tunnel ConstructingTechnology,2002,(Supp le.):338~342.

    [3]  铁道部第二勘测设计院编著.岩溶工程地质
    [M].北京:中国铁道出版社,1984.The second surveying and designing institute,m inistry of railway.Edit and W riting,Karst Engineering Geology.Beijing:ChinaRailway Press,1984.

    [4]  中华人民共和国国家标准.工程岩体分级标准(GB50218-94)
    [S].北京:中国计划出版社,1994.China national standards.The standard of engineering rock massclassification(GB50218-94).Beijing:China Planning Press,1994.

    [5]  王滨,贺可强,孙建敏.岩溶塌陷临界土洞高度的确定———以唐山市体育场岩溶塌陷为例
    [J].工程地质学报,2005,13(3):320~324.W ang B in,et al..Determ ination of critical height of soil holes ofkarst collap se.Journal of Engineering Geology,2005,13(3):320~324.

    [6]  刘之葵,梁金城,周健红.岩溶区土洞发育机制的分析
    [J].工程地质学报,2004,12(1):45~49.L iu Zhikui,et al..Analysis of formation mechanism of soil cavesin karstic area.Journal of Engineering Geology,2004,12(1):45~49.

    [7]  陈祥军,马凤山,王思敬,程国明.溶蚀岩体随机结构模型建立及其在岩体渗漏评价中的应用
    [J].工程地质学报,2004,12(2):193~198.Chen Xiangjun,et al..The stochastic structure model of karsticrock and its app lications in leakage evaluation.Journal of Engineering Geology,2004,12(2):193~198.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (3404) PDF downloads(1066) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint