GAO Qian, WU Shunchuan, WU Xuemin. 2005: APPLICATION OF PRE-STRESSED CABLE IN SUPPORTING FOR NONWORKING SLOPE IN THE WEST OPEN PIT OF PINGZHUANG COAL MINE. JOURNAL OF ENGINEERING GEOLOGY, 13(2): 257-262.
Citation: GAO Qian, WU Shunchuan, WU Xuemin. 2005: APPLICATION OF PRE-STRESSED CABLE IN SUPPORTING FOR NONWORKING SLOPE IN THE WEST OPEN PIT OF PINGZHUANG COAL MINE. JOURNAL OF ENGINEERING GEOLOGY, 13(2): 257-262.

APPLICATION OF PRE-STRESSED CABLE IN SUPPORTING FOR NONWORKING SLOPE IN THE WEST OPEN PIT OF PINGZHUANG COAL MINE

  • Received Date: 2004-03-31
  • Rev Recd Date: 2004-05-26
  • Publish Date: 2005-04-22
  • Pre-stressing cable has rarely been used in supporting mining slopes even though it has been widely applied in geotechnical slope projects. This paper presents an engineering example for the application of pre-stressing cable in supporting excavated slope in the west open-pit of the Pingzhuang coalmine. Slope stability analyses are conducted under different geological conditions and supporting parameters. The results indicate that the stability of the slope is increased with the pre-stressed cable, and reinforcing parameters satisfy the requirements for safe operations. The technique has been adopted to enhance the slope stability in the mine.
  • loading
  • [1] 孙玉科,姚宝魁,许兵.矿山边坡稳定性研究的回顾与展望
    [J].工程地质学报,1998,6(4):,305~311.Sun Y uke,Y ao B aokui, X u B ing.R eview and Prospect on R esearch of Stab ility forM in ing slope.Journal of Eng ineering G eology,1998,6(4):,305~311.

    [2] 北京科技大学.平庄西露天矿非工作帮边坡预应力锚索加固技术研究
    [R],2003.U n iversity of S cience and Technology of B eijing.R esearch on rein forcing Technology by P re-stress cable for no-w ork ing s lop e inPing zhuang open m ine,2003.

    [3] GEO-SLOPE Intern at ion al Ltd.SLOPE/W for slope stab ility analys is U ser&s G u ide
    [S],1999.

    [4] 平庄矿务局西露天煤矿.平庄西露天煤矿生产地质水文地质及边坡工程地质报告
    [R],1995.Ping zhuang w est open coal m in e.R eport on engin eering geology
    and hyd rology geology for Ping zhuang w est open p it of P ing zhuangm in e,1995.

    [5] 杨志法,张路青,尚彦军,李丽慧.边坡工程加固需求度评价及其应用
    [J].工程地质学报,2004,12(1):12~20.Y ang Zh ifa,et a.l A ssessm en t of rein forcem en t dem and degree for s lope engineering p rojects and its appl icat ion s.Joural of Eng ineering G eology,2004,12(1):12~20.

    [6] 张季如,曹星.山区公路开挖边坡的稳定性研究及其工程治理以大甘坪路堑边坡为例
    [J].工程地质学报,2003,11(1):64~69.Zhang Jiru,Cao X ing.R esearch on stab ility of cu t s lop es and their t reamt en t for m ountain road take th e cu t slope in D aganping as exam pl. Joural of Eng ineering G eology,2003,11(1):64~69.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (2670) PDF downloads(976) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint