LIU Yanhui, DAI Qianxun, LIU Da'an, HAN Fang, CHENG Dongxing. 2005: DEFORMATION MONITORING ANALYSIS IN THE CREEPING ROCK SLOPE B ON THE LEFT BANK OF LONGTAN HYDROPOWER STATION. JOURNAL OF ENGINEERING GEOLOGY, 13(2): 269-274.
Citation: LIU Yanhui, DAI Qianxun, LIU Da'an, HAN Fang, CHENG Dongxing. 2005: DEFORMATION MONITORING ANALYSIS IN THE CREEPING ROCK SLOPE B ON THE LEFT BANK OF LONGTAN HYDROPOWER STATION. JOURNAL OF ENGINEERING GEOLOGY, 13(2): 269-274.

DEFORMATION MONITORING ANALYSIS IN THE CREEPING ROCK SLOPE B ON THE LEFT BANK OF LONGTAN HYDROPOWER STATION

Funds:

  • Received Date: 2004-03-11
  • Rev Recd Date: 2004-06-03
  • Publish Date: 2005-04-22
  • This paper analyzes the deformation monitoring data in the creeping rock slope B on the left bank of Longtan Hydropower station by considering the monitoring data of ground water levels and rainfall. The results show that deformation of creeping rock slope occurs above 520 meters in the elevation, and the strong weathering line or creeping rock mass breaking face controls the rock mass deformation of slope B. With drainage and loading at the toe of the slope, deformation velocity of rock mass is gradually reduced and almost reaches a steady state over time. The authors conclude that deformation monitoring near the strong weathering line or creeping rock mass breaking face should be continued, especially during the impoundment period, and therefore surface and ground water drainage systems could thus be well maintained.
  • loading
  • [1] 电力工业部中南勘测设计研究院.岩质高边坡稳定分析及处理技术在龙滩工程中应用(二)———左岸倾倒蠕变岩体B区边坡稳定与治理研究
    [R],1995.M id-south Design&Research Institute for Hydroelectric Project,Power Industry Department.The app licationof rock high slope stability analysis and handing technology in the Longtan engineering(2)—the stability and harnessingresearch of creep ing rock slope Bin the left bank,1995.

    [2] 中国科学院地质研究所,水电部中南勘测设计院.红水河龙滩坝址左岸倾倒蠕变体稳定性研究-综合报告
    [R],1987.The Institute of Technology,CAS,and M id-south Design&Research Institute for Hydroelectric Project,W ater and Electricity Department.The stability research of left bank topp ling rock mass in the Longtan dam iste—synthesize report,1987.

    [3] 王思敬,肖远.反倾向层状岩体弯曲倾倒变形破坏机理及其工程对策研究报告(一)、(二)
    [R],1993.W ang Sijing,Xiao Yuan.The study report about topp ling deformation and failure mechanism and its engineering measure of counter tendencybedded rock mass(1),(2),1993.

    [4] 王思敬,肖远,杜永廉.广西红水河龙滩水电站坝址左岸边坡层状岩体弯曲蠕变机理分析
    [J].地质科学(增刊),1992,342~352.W angSijing,Xiao Yuan,Du Yonglian.The mechanism of bending creep of bedded rock mass in the slope on the left bank of Longtan Dam iste
    [J].1992,Geologic Science(supp lement),342~352.

    [5] 韩贝传,王思敬.边坡倾倒变形的形成机制与影响因素分析
    [J].工程地质学报,1999,7(3):213~217.Han Beichuan,W ang Sijing.Mechanism for topp ling deformation of slope and analysis of influencing factors on it
    [J].Engineering Geological Journal,1999,7(3):213~217.

    [6] 陈红旗,黄润秋.反倾层状边坡弯曲折断的应力及挠度判据
    [J].工程地质学报,2004,12(3):243~246.Chen Hongqi,Huang Runqiu.Stress and flexibility criteria of bending and breaking in a countertendency layered slope.Joural of Engineering Geology,2004,12(3):243~246.

    [7] 钟辉亚.岩质边坡工程的位移信息分析
    [D].中国科学院地质研究所博士论文,1996.Zhong Huiya.The disp lacement information analysis of rock slope engineering,Doctor paper in the institute of geology,CAS,1996.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (2497) PDF downloads(889) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint