AN OVERVIEW OF THE CHINAS SOUTH-NORTH WATER TRANSFER PROJECT AND ITS MAJOR ENGINEERING GEOLOGICAL PROBLEMS

  • Received Date: 2004-10-25
  • Rev Recd Date: 2004-11-02
  • Publish Date: 2004-12-15
  • The South-North Water Diversion Project (SNWDP) is a world-attracted giant trans-basin water transfer project, which consists of three routes: the east route, the central route and the west route. Due to its large coverage that crosses several river basins, engineering geological conditions of the SNWDP are characterized by diversity and complexity. In particular, various and very complicated engineering geological problems, which are rarely encountered both in China and abroad, exist along the west route, due to its unique geographic location, climate, tectonic settings and scale. As a result, the geological investigation is a very difficult task. Properly solving engineering geological problems encountered in the SNWDP will not only meet the basic requirements for the timely completion of the project, but also advance the engineering geosciences and relevant technologies as well.
  • loading
  • [1]  李广诚,司富安.南水北调工程地质分析研究论文集
    [M].北京:中国水利水电出版社,2001Liguangcheng,Si Fu′an.Proceedings of engineering geology studyfor t he Sout h to Nort h Water Diversion Project.Beijing:ChinaWater Press,2001.

    [2]  李广诚.南水北调西线隧道工程地质勘察评价方法的思考与建议
    [J].水利规划与设计,2002,4:37~41.Liguangcheng.Considerations and suggestions on engineering geological investigations for t he tunnels of West Route Project of t heSout h toNort h Water Diversion.Water Resources Planning andDesign,2002,4:37~41.

    [3]  尚彦军,王思敬等.南水北调中线工程沿线文物分布特征及其受渠道工程影响的模糊评价
    [J].工程地质学报,2002,10(2):134~140.Shang Yanjun,et al..Geomorphological distribution of culturalrelics along t he canal line of t he middle route project of watertransferring from Sout h to Nort h China and potential influence appraisal.Journal of Engineering Geology,2003,10(2):134~140.

    [4]  张永双等.南水北调中线工程上第三系膨胀性硬粘土的工程地质特性研究
    [J].工程地质学报,2002,10(4):367~377.Zhang Yongshuang,et al..Engineering geological properties ofneogene hard clay along t he middle line of t he nort h-sout h diversion water project China.Journal of Engineering Geology,2002,10(4):367~377.

    [5]  周兴志.南水北调新线路———三峡水库引水济黄济华北段工程地质条件
    [J].工程地质学报,2003,11(2):208~212.Zhou Xingzhi.Engineering-geological conditions for a new lineof Sout h-Nort h Water-diversion project from t he Three Gorgesreservoir to Yellow River and Nort h China.Journal of EngineeringGeology,2003,11(2):208~212.

    [6]  咸付生,柴宝.山西万家寨引黄工程总干线湿陷性黄土工程地质特征及隧洞变形破坏的工程处理
    [J].工程地质学报,2003,11(4):402~405.Xian Fushen,Chai Bao.Engineering-geological characteristics ofsubsiding loess along main line of t he project of diverting waterfrom Yellow river at Wanjiazai,Shanxi,and engineering treatment of tunnel deformation and failure.Journal of Engineering Geology,2003,11(4):402~405.

    [7]  王学潮,马国彦.南水北调工程西线工程及其主要工程地质问题
    [J].工程地质学报,2002,10(1):38~45.Wang Xuechao,MA Gouyang.Introduction to engineering projectof water diversion from t he upper Yangtze river into t he upperYellow river and its main engineering geological problems.Journalof Engineering Geology,2002,10(1):38~45.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (4070) PDF downloads(895) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint