Taking the soft soil on river beach as research object and settlement plates,deflection inclinometer, and piezometer as testing apparatus, the stability and settlement of representative sections of the beach were observed for more than one year. By analysis of the observed data, a settlement regularity was found and its coefficient - ms was calculated. The obtained result it will be of significanace in construction of high-grade highway on the beach soft soil in the future.
[1] 张诚厚,袁文明,戴济群等编著.高速公路软基处理 [M].北京:中国建筑工业出版社,1997Zhang Chenghou,Y uan Wenming,Dai Jiqun et al.The dis posal of highw ay embankment on soft ground.Beijing:Chin ese Archit ec t ure In dust ry Press,1997.
[2] 赵九斋.连云港软土路基沉降研究.岩 [J].土工程学报,2000,22(6):643~649.Zhao Jiuzhai.Research on sett lement of sof t clay ground in L i anyungang.Chinese Journal of G eotechnical Engin eering,2000,22(6):643-649.
[3] 叶书麟等.地基处理与托换技术 [M].北京:中国建筑工业出版社,1997.Ye S hulin et al.G round t reat ment and underpinning technology.Beijing:Chinese Arch it ecture Industry Press.
[4] 中华人民共和国行业标准.公路软土地基路堤设计与施工技术规范(JTJ017-96) [S].北京:人民交通出版社,1997.Technical specifications for design and construct ion of highway embankment on soft ground.(JT J017-96)Beijing:People t raf fic Press,1997.