MAJOR ENGINEERING-GEOLOGICAL AND ENVIRONMENTAL PROBLEMS IN CHINA IN 21ST CENTURY

  • Received Date: 2000-11-20
  • Rev Recd Date: 2001-02-20
  • Publish Date: 2001-04-22
  • It is pointed that large scale construction in China in the 21th century will lead to a lot of engineering geological and environmental problems inevitably; Engineering geology of the 21th century is in China. In the 21 century, the major engineering geological problems in the mountain areas of western China are: dynamic stability of rock soil mass in tectonically active region, strain energy storage and behavior of rock mass under high stress, scale effect of deformation of high steep slope and its dynamic stability, temperature and pressure of rock mass at the location of deeply buried long tunnels, rock mass structure detection and advanced geological prediction for construction of deeply buried tunnel, interaction of deformation and stability of large and complex excavation group, freeze and thaw deformation, stability of frozen earth and their treatment, karst distribution regularities and use of weak solution rock mass, treatment and utilization of thick overburden on river bed. etc. Engineering geological subjects in the eastern China and the coastal region are, deformation and stability of soft foundation and its treatment in construction of high speed traffic network, large scale deformation and its treatment of deeply mining tunnel in soft rock, foundation deformation and stability of large bridge piers in thick loose deposits, engineering geological and hydro geological problems of submarine tunnel, engineering geological problems of underground space development in urban area. Besides, major environmental problems are: water loss and soil frosion and regional desertization in northern China, suspended river in lower Yellow River and bank caving and stability in lower Yangtse River, environmental problem caused by cut off of lower Yellow River, short of water resource in dry climate region of northern China, environmental deteriortion pollution control in process of urbanization. Chinese engineering geologists should promote the theoretical research on the following aspects and develop the Chinese engineering geology: structural soil mechanics and structural mechanics of rock mass, fundamental principles of engineering geology and engineering geological dynamics, mechanism of inter action between human being and the earth and environmental engineering geology, theory, methodology,and techniques of geological engineering.
  • loading
  • [1]  水利部黄河水利委员会勘测规划设计研究院.南水北调西线工程规划研究阶段工程地质简要报告
    [R],1996.Institute of Survey,Design and Planning of the Yellow River WaterConservancy Commission,Ministry of Water Conservancy,PRC.AGeological Report on Engineering Geology in the Planning Period of”Projects of Diverting Water from the South to the North”,1996.


    [2]  中华人民共和国地质矿产部,中华人民共和国国家科学技术委员会,中华人民共和国国家计划委员会.中国地质灾害与防治
    [M].北京:地质出版社,1991.Ministry of Geology and Mineral Resources,PRC,State Science andTechnology Commission and State Planning Commission,1991.China’s Geologic Disasters and Control.Beijing:Geological PublishingHouse,1991.


    [3]  吴云生等.秦岭隧道施工对设计成果验证情况的汇报,新建和规划铁路重大工程地质问题预测研讨会主题报告
    [R],1999,1~19.Wu Yunsheng et al..A Checking Report on the Design Scheme ofQinling Tunnels by Construction.A keynote speech in the symposium on prediction of major engineering geological problems of newlybuilt and planning railways,1991,1~19..


    [4]  曾德礼.滇藏铁路主要工程地质问题简述,新建和规划铁路重大工程地质问题预测研讨会主题报告
    [R],1999.1,1~19.Zeng Deli.A Brief Introduction of Engineering Geological Problemsof The Yunnan2Tibet Railway,A key2note speech in the symposiumon prediction of major engineering geological problems of newly builtand planning railways,1991.


    [5]  傅冰骏.中国水利水电建设岩石力学与工程实践
    [A].面向21世纪的岩石力学与工程
    [C].北京:中国科学技术出版社,1996,41~52.Fu Bingjun,1996.Rock Mechanics and Engineering Practices ofChina’s Irrigation and Hydropower Construction.In:Rock Mechanics and Engineering toward the 21st Century.Beijing:Sceience andTechnoloqy Press,1996,41~52.


    [6]  孙广忠.地质工程理论与实践
    [M].北京:地震出版社,1996,53~69.Sun Guangzhong,1996.Theory and Practice of Geological Engineering.Beijing:Seismological Press.53~69.


    [7]  冯玉勇等.西南山区河床深厚覆盖层的建坝工程地质问题
    [J].工程地质学报,2000,8(增刊):195~201.Feng Yuyong,Zhang Yongshuang,Qu Yongxin,Wang Sijing andZhao Xitao.Engineering Geological Problems in Dam Building onThick Cover beds of Mountainous Rivers of Southwest China.Journalof Engineering Geology,8(Supplement):195~201.


    [8]  刘玉海、陈晓键.中国大城市东西空间利用及其工程地质问题
    [J].工程地质学报,2000,8(增刊):249~253.Liu Yuhai and Chen Xiaojian,2000.Utilization of undergroundSpace in China’Large Cities.Journal of Engineering Geology,8(Supplement):249~253.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (3367) PDF downloads(818) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint