WANG Xuechao, MA Guoyan. 2002: INTRODUCTION TO ENGINEERING PROJECT OF WATER DIVERSION FROM THE UPPER YANGTZE RIVER INTO THE UPPER YELLOW RIVER AND ITS MAIN ENGINEERING GEOLOGICAL PROBLEMS. JOURNAL OF ENGINEERING GEOLOGY, 10(1): 38-45.
Citation: WANG Xuechao, MA Guoyan. 2002: INTRODUCTION TO ENGINEERING PROJECT OF WATER DIVERSION FROM THE UPPER YANGTZE RIVER INTO THE UPPER YELLOW RIVER AND ITS MAIN ENGINEERING GEOLOGICAL PROBLEMS. JOURNAL OF ENGINEERING GEOLOGY, 10(1): 38-45.

INTRODUCTION TO ENGINEERING PROJECT OF WATER DIVERSION FROM THE UPPER YANGTZE RIVER INTO THE UPPER YELLOW RIVER AND ITS MAIN ENGINEERING GEOLOGICAL PROBLEMS

  • Received Date: 2002-01-17
  • Publish Date: 2002-01-22
  • In this paper the regional geological conditions and geological features for diversion of river reaches in the engineering project of water diversion from the upper Yangtze River into the upper Yellow River are introduced. Rocks mainly consist of epimetamorphic sandstone and slate, which widespread in the region of the western line project. The strata were stronely folded. Active faults are distributed over the project area. The surface is covered by thick vegetation. So the geological conditions are relatively complicated. Main engineering geological problems such as geostresses and rock burst, soft rock creep, water invasion, debris flow, paroxysmal dislocation of active fault, and high geotemperature damage are discussed in the paper. The geological problems encountered in the first stage of the project are the stability of deeply buried tunnel and slop stability of opened channel.
  • loading
  • [1] 王学潮,张辉,刘振红等.南水北调西线工程雅砻江调水区横向构造的地质特征及成因机制
    [J].华北水利水电学院学报,1999,20(2):1~6.W ang X uechao,Zhang Hui,Liu Zhen-hong et al.Geological feat ures of t ransverse st ruct ures in Y alongjiang water-t ransferringregion and it s mechanics.Journal of Nort h China Inst it ut e of W at er Conservancy and Hydroelect ric Pow er,1999,20(2):1~6.

    [2] 国家质量技术监督局.中国地震动参数区划图(G B 18306-2001)
    [S].北京:中国标准出版社,2001.Bureau of Q ualit y and Technique S upervise.Seismic ground mot ion parameter zonat ion map of China.Beijing:China st andardpress,2001.

    [3] 侯志忠,樊晋生,袁虎.TBM掘进机在万家寨引黄工程国际标开挖中所遇围岩类别的确定
    [J].水利水电技术,2001,32(4):50~52.Hou Zhi-zhong,Fan J in-sheng.Determ ination of surroundingrock type of t unnels excavat ed by T BM in sout h trunk line ofY R DP.Water R esource an d Hydropow erEngineering,2001,32(4):50~52.

    [4] 黄润秋,王贤能,唐胜传,王士天.深埋长隧道工程开挖的主要地质灾害问题研究
    [J].地质灾害与环境保护,1997,8(1):50~68.H uang Runqiu,Wang X ianneng,Tang Shengchuan,etc.Research on t he main geological hazards of deep-lying long tunnel
    [J].Journal of Geological Hazards and Environment Preservation,1997,8(1):50~68.

    [5] 王钧,黄尚瑶,黄歌山等.中国地温分布的基本特征
    [M].北京:地震出版社,1990,36~66.Wang Jun,Huang S hang-yao,Huang G e-shan,et al.Basiccharacterist ics of t he eart h)s temperat ure dist ribut ion in China.Beijing:Seismological Publishing H ouse,1990,36~66.

    [6] 王学潮,郭启良,张辉等.青藏高原东北缘水压致裂地应力测量
    [J].地质力学学报,2000,6(2):64~70.Wang Xue-chao,G uo Q i-liang,Zhang Hui,et al.Crustalstress measurement in N ort heast ern Q ingzang plat eau by hydrof ract uring.Journal of Geomechanics,2000,6(2):64~70.

    [7] E Hoek,P M arinos.Predicting squeeze
    [J].T unnels and Tunneling Int ernat ional.2000,N ovember,45~50;December,33~36.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (3169) PDF downloads(1000) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint