Ding Enbao, Ling Ronghua, Ma Jiping. 1995: DISCUSSION ON TUNNEL ENGINEERING GEOLOGICAL PREDICTION METHODS. JOURNAL OF ENGINEERING GEOLOGY, 3(1): 28-34.
Citation:
Ding Enbao, Ling Ronghua, Ma Jiping. 1995: DISCUSSION ON TUNNEL ENGINEERING GEOLOGICAL PREDICTION METHODS. JOURNAL OF ENGINEERING GEOLOGY , 3(1): 28-34.
Ding Enbao, Ling Ronghua, Ma Jiping. 1995: DISCUSSION ON TUNNEL ENGINEERING GEOLOGICAL PREDICTION METHODS. JOURNAL OF ENGINEERING GEOLOGY, 3(1): 28-34.
Citation:
Ding Enbao, Ling Ronghua, Ma Jiping. 1995: DISCUSSION ON TUNNEL ENGINEERING GEOLOGICAL PREDICTION METHODS. JOURNAL OF ENGINEERING GEOLOGY , 3(1): 28-34.
DISCUSSION ON TUNNEL ENGINEERING GEOLOGICAL PREDICTION METHODS
1.
Institute of geology,Chinese Academy of Sciences, Beijing 100029;
2.
North China Electric Power Group,Beijing 100011
Received Date: 1994-08-08
Publish Date:
1995-01-22
Abstract
In this paper the hydro-engineering geological conditions caused tunnel collapse and water gush,the prediction methods before and at construction steps and its importnt economic benefit are discussed from some existing examples. Five principles for improving prediction coincidence ratio are put forward.
References
[1] 邓乃恭.断裂带附近地层或褶皱的牵引现象.地质力学论从,1976 (3). [2] 王景明.河北煤矿井田深部煤层中构造裂隙特征研究.地质力学论从,1976 (3) [3] 丁恩保.低地应力及其工程地质意义.水文地质工程地质,1993, (4).
Proportional views