CAO Xingshan, QING Chunhe. 2007: EVALUATION OF ENGINEERING GEOLOGICAL CONDITIONS FOR A LARGE GAS PIPELINE TUNNEL CROSSING YELLOW RIVER AT ZHONGWEI,NINGXIA PROVINCE. JOURNAL OF ENGINEERING GEOLOGY, 15(3): 338-345.
Citation: CAO Xingshan, QING Chunhe. 2007: EVALUATION OF ENGINEERING GEOLOGICAL CONDITIONS FOR A LARGE GAS PIPELINE TUNNEL CROSSING YELLOW RIVER AT ZHONGWEI,NINGXIA PROVINCE. JOURNAL OF ENGINEERING GEOLOGY, 15(3): 338-345.

EVALUATION OF ENGINEERING GEOLOGICAL CONDITIONS FOR A LARGE GAS PIPELINE TUNNEL CROSSING YELLOW RIVER AT ZHONGWEI,NINGXIA PROVINCE

Funds:

  • Received Date: 2006-04-29
  • Rev Recd Date: 2006-09-10
  • Publish Date: 2007-05-29
  • This paper presents the evaluation of the engineering geological conditions for a large tunnel crossing Yellow River at Zhongwei.The tunnel is to transport gas from the western China to-the eastern China and is 1197.7 7m long and 4.3 m high and 5.6 m wide.The elevation of the tunnel ceiling is 1130 m above the sea level and 100 m below the Yellow River.The surrounding rocks are the Cambrian rocks,Mopanjing Formation and include celadon and silver-gray metamorphic medium heavy bedded fine-granular feldspar quartz sandstone and phyllitic slate and sericite phyllite.The class of the surrounding rock quality is III-IV.The permeable ratio is between 4 and 67 Lu,the P-wave velocity is from 500 to 3300 ms-11.The BQ value is between 300 and 400.Modulus of deformation is between 6.11 and 9.22 GPa.Poissons ratio is between 0.14 and 0.24.The internal friction angle() is between 42.1 and 44.7.The groundwater is the water in fissures of the bedrock.The aquifer supplied by atmospheric precipitated water is the agnostogenic rocks of the Cambrian system.The seepage capacity of a signle well is 1.0 ~50 m3 per day.The traverse rock tunnel axis is from relative intact to relative broken rocks,and has no active faults.The alignment and depth of the tunnel design is adequate and feasible.The construction and long-term operation are safe.
  • loading
  • [1]  孟晖.黑山峡地区地震活动性分析
    [J].水文地质工程地质,1989,(3):29~31.Menghui.The seism ic activity analysis of Heishanxia area.Hydrological Engineering Geology,1989,(3):29~31.

    [2]  李宝贵,等.长流水幅(J48E016012)1/5万地质图及说明书
    [R].宁夏:宁夏地矿局勘察院,1997.L ibaogui Geological map s and brochures of Changliushui 1:50000.N ingxia:N ingxia Institute of Geology and M ineral Resources Bureau survey,1997.

    [3]  中华人民共和国建设部.岩土工程地质勘察规范(GB50021—2001)
    [S].北京:中国建筑工业出版社出版,2002.M inistry of the Peop le’s Republic of China.Geotechnical engineering geological p rospecting(GB50021-2001).Beijing:China’s Construction Industry Publisher,2002.

    [4]  中华人民共和国水利水电工程局.水利水电工程地质勘察规范(GB50287—99)
    [S].北京:水利水电出版社,1999.Peop le’s Republic of China W ater Conservancy and Hydropower Engineering Bureau.Geological p rospecting for water conservancy and hydropower p rojec.t(GB50287-99).Beijing:Hydropower Press,1999.

    [5]  常士骠,张苏民,项勃,等.工程地质手册
    [M].北京:中国建筑工业出版社,1992,675~700.Chang Shibiao,Zhang Sum in,Xiang Bo.Geological engineering manua.lBeijing:China’s Construction Industry Press.1992,675~700.

    [6]  国家地震局.中国地震烈度区划图
    [S].北京:国家技术标准出版社,1990.State Seismological Bureau.The seism ic zoning map of China.Beijing:National Technical Standards Press,1990.

    [7]  国家质量技术监督局.中国地震动参数区划图(GB18306—2001)
    [S].北京地震出版社,2001.State Bureau of Quality and Technical Supervision.China seism ic zoning map(GB18306-2001).Beijing Seismological Press,2001.

    [8]  交通部第~公路勘察设计院.公路工程地质勘察规范(JTJ064—98)
    [S].北京:人民交通出版社出版,1999.First Traffic H ighway Survey and Design Institute.H ighway geological p rospecting(JTJ064-98).Beijing:Peop le Traffic Publisher,1999.

    [9]  河北省地质局水文地质四大队主编.水文地质手册
    [M].北京:地质出版社出版,1978,622~626.Geological bureau hydrogeological four team s editor in Hebei p rovince.Hydrogeological manual
    [M].Beijing:Geological Publisher,1999.

    [10]  张永双,曲永新.陕北晋西砂黄土的胶结物与胶结作用研究
    [J].工程地质学报,2005,13(1):18~28.Zhang Yongshuang,et al..Cements of sand loess and their cementation in north Shaanxi and west Shanx.iJournal of Engineering Geology,2005,13(1):18~28.

    [11]  李晓,等.公伯峡电站开挖边坡古风化岩松弛与工程特性变化研究
    [J].工程地质学报,2005,13(1):155~159.L i Xiao,et a.l.Study on relaxation and change in engineering characteristic of the rock paleo-weathered after slope excavated.Journal of Engineering Geology,2005,13(1):155~159.

    [12]  周洪福,聂德新,韦玉婷,等.黄河上游某电站上新统石膏夹层对坝基岩体稳定性影响评价
    [J].工程地质学报,2006,14(1):41~44.Zhou Hongfu,N ie Dexin,W ei Yuting,W an Zongli,et a.l.Evaluation on influence of the p liocene gyp sum layer on stability of dambase at a hydropower p lant on the up stream of the Yellow R iver.Journal of Engineering Geology,2006,14(1):41~44.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (3442) PDF downloads(952) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint